Asphalt Repairs

Asphalt that has developed alligator cracks or has deteriorated is cut away from the sudgrade.The underneath base is then prepared, re-graded and re-compacted for new hot asphalt installation. New hot asphalt is then placed in the area at a depth of ( on average ) 4" Inches.

 

 

 

BACK